IT & NETWORK ยท STRUCTURED CABLING

Structured Cabling Installation: The cabling behind everything else โ€” done once, done right

Structured cabling gets installed once every 10โ€“20 years and then disappears behind walls and ceilings. Getting the standard right at the outset matters more here than almost anywhere else in an IT project, because there’s no cheap way to fix it later.

Where it’s used

Built for the environment, not a generic spec sheet

New fit-outs

Cabling designed into the building from the start, not retrofitted around finished ceilings.

Office refurbishments

Upgrading ageing Cat5e cabling to a standard that supports the next decade, not just this year’s requirement.

Comms room & rack builds

Structured, labelled, tested termination โ€” the difference between a comms room you can support and one nobody wants to touch.

Typical investment

What structured cabling costs

Indicative ranges, supplied and installed. Every project is scoped individually — this is a starting point for budgeting, not a quote.

ConfigurationTypical useFrom
Cat6 data pointSupplied, installed, testedยฃ85 +VAT
Cat6a data pointSupplied, installed, testedยฃ115 +VAT
Comms room / rack buildPatch panels, containment, labellingยฃ850 +VAT
Certified testing & documentationPer data pointincluded

Public sector and education purchase orders accepted.

Prefer to talk it through? Call 0845 095 3600 or email info@efficient-is.co.uk โ€” we’ll give you a straight answer, not a sales script.

How we deliver it

Assess, design, install, support — one team throughout

01

Assess

Site survey or environment review, requirements gathering, budget options.

02

Design

A specification matched to your actual requirement, not the biggest number on a spec sheet.

03

Install & commission

Delivered by our engineers in Scotland, or a vetted local partner, anywhere in the UK โ€” tested and commissioned before we call it done. Recent examples include a multi site structured cabling programme we delivered for a national security systems provider across their Manchester and Birmingham locations.

04

Handover, training & support

Documentation, formal handover, hands-on training, and optional ongoing management โ€” it@efficient-is.co.uk.

Questions we’re asked most

Structured Cabling Installation: Answered Plainly

Should we install Cat6 or Cat6a?

Cat6a has become the baseline for new UK office installations in 2026 โ€” it supports 10 Gigabit Ethernet over the full 100-metre cable run and handles PoE-heavy deployments (WiFi access points, IP cameras) more reliably. Cat6 remains a reasonable choice for budget-constrained projects with predominantly short cable runs.

How long does structured cabling actually last?

A properly installed structured cabling system typically has a useful life of 15โ€“20 years, which is exactly why the standard chosen at installation matters more than almost any other single decision in the project.

Does cabling need to change for modern WiFi access points and IP cameras?

Often yes โ€” higher-power PoE+ and PoE++ devices need Cat6A to deliver power reliably, especially in dense cable bundles where heat build-up becomes a factor.

Have a network, cloud or CCTV project in mind?

Tell us the environment and the outcome you need โ€” we’ll tell you what’s realistic.

๐Ÿ“ž 0845 095 3600  ·  โœ‰ info@efficient-is.co.uk

Book a discovery call
More about structured cabling

Do you provide fibre backbone cabling as well as copper to the desk?

Yes. Fibre is commonly used for backbone runs between comms rooms or floors, particularly over longer distances or where future bandwidth headroom matters, with copper Cat6 or Cat6a continuing to the desk. Which mix makes sense depends on the building’s layout and the distances involved, which the site survey confirms.

What testing do you carry out before handover?

Every data point is certified using a calibrated cable tester, checking for continuity, length, crosstalk and attenuation against the relevant Cat6 or Cat6a standard, with a test report included in the handover documentation for every point installed.

Is the cabling labelled and documented, or just installed?

Every cable run and patch panel port is labelled to match a floor plan and schedule provided at handover, so any future engineer, whether ours or someone else’s, can identify a specific run without having to trace it physically.

Find our work useful? Add us as a preferred source on Google.